Project Details
Construction Date
2011-2012
Location
Minitonas MB
Catagory
Civil Earthworks
Project Description
Work included decommissioning of old lagoon, reconstruction of first two cells. Moved approximately 125,000 m3 of topsoil and clay, and reconstructed and recompacted the old dikes. Installed a new 30-mil, 45,000 m2 plastic PUC liner in the two cells. Bedded the liner with sand and put rock rip rap on the slope to prevent slope erosion and promote slope stabilization.